Exterior site work is progressing. Backfill of exterior building walls and the site retaining walls are almost complete. Installation of the chilled water, hot water piping from HHSB is ongoing. The fourth floor slabs are complete and preparation for the fifth floor slab is in progress. Interior masonry walls, telecom, fire alarm, electrical conduits, and HVAC (heating, ventilation, and air conditioning) ductwork are being installed on the lower levels. Overall progress is tracking well, but with the winter weather ahead we are anticipating some impacts on the schedule. 